400 PERSON PACKAGE TREATMENT
QUALITY AND ECONOMIC 400 PERSON PACKAGE TREATMENT SYSTEM MANUFACTURER ...
400 Person Package Treatment Systems, as the name suggests, can be considered as "Package Treatment - Compact". Our units are produced in our own factory without being dependent on the outside. By adding units to the package treatment system, they can respond to the desired flow or capacity. Our company provides service with its technological factory.
400 PERSON PACKAGE TREATMENT SYSTEM PACKAGE WASTEWATER TREATMENT TECHNOLOGIES
-
Municipalities, Counties and Villages
-
Mass Housing and Buildings
-
Stadium 400 Person Package Treatment System
-
Construction Sites 400 Person Package Treatment System
-
Universities and Campuses
-
Military Facilities
-
Prison Package treatment
-
Refugee and Temporary Campgrounds
-
Student Dormitories and Campuses
-
Hotel 400 Person Package Treatment System
-
Hobby Gardens and Nature Tourism
-
Slaughterhouse Package treatment
-
Villas and Sites 400 Person Package Treatment System
-
Organized Industrial Zones
-
Factories and Industrial Sites
-
Other Special Package Treatment Projects
400 Person Package Treatment System Working Principle
SCREEN CHANNEL
Wastewater reaches the area where the manual or automatic cleaning screens are located, and then the insoluble solids in it are retained and removed from the system.
Manual Gratings are generally manufactured as ST37 material and galvanized coating. However, depending on the population and flow rate, "Automatic Mechanical Screen" should be preferred.
The mechanical screen works automatically and automatically transfers the solid materials to the waste bucket.
PRE-SEDIMENTATION BASIN
The wastewater, which is purified from solid materials by passing through the screen channel, reaches the Pre-sedimentation basin. By keeping the solids in this basin, the pollution load of the wastewater is reduced. It allows the mechanical equipment throughout the system to run smoothly.
Solid particles (sludge) accumulating on the sedimentation basin floor generally need to be removed from the system at certain periods by pulling them with the help of vacuum trucks.
EQUALIZATION BASIN
The water transferred from the upper level of the pre-sedimentation basin is collected in the “EQUALIZATION BASIN”. The balancing basin, designed on a project basis, is used to store water.
Particularly, the wastewater that may occur at any time of the day is transferred to the 400 PERSON PACKAGE TREATMENT SYSTEM with the help of a submersible pump at a homogeneous and balanced flow rate.
BIOLOGICAL PACKAGE TREATMENT TANK (REACTOR) SBR-STP
Wastewater taken from the equalization basin with the help of a pump is transferred to the BIOLOGICAL REACTOR (400 Person Package Treatment System) tank, which is sized on the basis of project and flow. With the help of the level floats in the package treatment, a certain level of wastewater is taken.
Oxygen transfer is provided by the blower, which is compact in the system, for the reproduction of microorganisms. In this way, the wastewater reaches the oxygen richness at a rate. In the control of PLC Automation, the blower becomes passive and the organisms in the wastewater that remains dormant for a certain period of time precipitate to the bottom of the package treatment tank and are transmitted to the discharge line by the discharge pump. By making Chlorine dosage on the discharge line, possible escape of bacteria is prevented and odor formation is prevented.
400 PERSON PACKAGE TREATMENT SYSTEMS ADVANTAGES
MODULAR STRUCTURE
Easy and economical capacity increases and maintenance.
LOWER COSTS
Low initial investment costs and economical operation.
EASY OPERATION
Its operation is easier than other treatment processes.
ENERGY EFFICIENCY
Low energy efficiency and high working performance.